Strategically Secured Land | Site Control Established
High-Yield Infrastructure: Mojave eFreight Charging Hub
Profit Meets Planet: Direct Exposure to the $250B Decarbonization Market
Strategic EV Charging & eFreight Infrastructure: I-15 Mojave Hub
Pre-Entitled Site Control | Existing I-15 Interchange Access | Integrated Renewable Energy Expansion
Our Mojave flagship serves as the critical proof of concept, establishing a high-capacity infrastructure node to address the 95% supply gap along the Southwest’s primary freight artery.
20,000+
DAILY TRUCK VOLUME
Situated on the primary freight artery between Los Angeles and Las Vegas, capturing maximum volume from the 20,000+ trucks passing daily.
Future-Proofed
ADAPTIVE REGULATORY COMPLIANCE
Highest environmental specs ensure long-term capital preservation across shifting regulations. A de-risked asset providing elite power capacity for next-gen logistics.
Phase 2
DEVELOPMENT STATUS
Site control secured with pre-entitled status, significantly reducing typical multi-year permitting timelines and accelerating time-to-yield.
95%
rEGIONAL sUPPLY GAP
Current eFreight infrastructure covers less than 5% of projected demand on the Mojave route. This project fills a vital gap in the national supply chain.
THE MOJAVE HUB
- 100 Acres of Secured Land
- Direct I-15 Interchange Access
- Strategic Utility Infrastructure
Logistics Connectivity
Secured direct egress/ingress to the I-15 corridor—the indispensable artery for Southwest freight. This strategic access ensures permanent logistics dominance and de-risked regional distribution for the next generation of logistics.
STRATEGIC UTILITY ACCESS
Secured access to high-capacity power and water infrastructure designed to support heavy industrial demand and large-scale EV charging networks, eliminating the primary utility hurdles for institutional development.
CARBON ZERO READINESS
Strategically positioned to capture the inevitable shift toward sustainable freight, Mojave Hub offers a de-risked investment path through secured site control and high-capacity utility readiness for the next generation of logistics.
Development Program
Strategic allocation of the 100-acre Mojave Hub for mission-critical infrastructure.